Opportunities listed in this section are those not funded through 2018 Facilities Bond dollars. This may include issues for bid by GM/GC contractor(s) who are also providing services to the Bond Program.

UNDER REVIEW (Closed Mar 09 2020): Cabling Infrastructure

CORVALLIS SCHOOL DISTRICT 509J's (BEN: 144944) FCC Form 470 - #200019072 for Funding Year 2020 was posted to the USAC website on 1/31/2020. This posting begins the required 28 day competitive bidding process.

The Corvallis School District is seeking bid on 466 cabling drops at various locations. Specification can be found in the RFP documents attached to the form 470 posting.

There will be a Mandatory Informational Meeting and Site Visit Saturday, February 22, 2020, 9:00 AM-12:00 PM.

UNDER REVIEW (Closed Feb 28 2020): Network Switches

CORVALLIS SCHOOL DISTRICT 509J's (BEN: 144944) FCC Form 470 - #200011493 for Funding Year 2020 was posted to the USAC website on 1/31/2020. This posting begins the required 28 day competitive bidding process.

The District is seeking bid on seven (7) Cisco Catalyst 9500-16x switches or equivalent. Switches will need to be stackable, include network modules, and include all components, parts, power supplies, licenses and/or service agreements for equipment to be fully functional. The district is also seeking bids on seven (7) additional power supplies for the Cisco Catalyst 9500-16x switches or equivalent. All proposed equipment must be compatible with existing infrastructure.

UNDER REVIEW (Closed Jan 31, 2020): Copiers, Printers, Device Management/Usage

Corvallis School District is accepting proposals for Copier/MFD Hardware and Service, Device Management/Usage Tracking Software, and Printer/MFP Hardware Service and Supplies. Proposals will be accepted via on-line responses through Optimizon until Friday, January 31, 2020 at 3:00 PM Pacific time. For access codes to the on-line Bid system, contact Lisa Kitamura, Optimizon, by email at lkitamura@optimizon.com.

2018 Facilities Bond Program

The intended scope of the 2018 Facilities Bond Program includes two new elementary schools which will replace Hoover and Lincoln Elementary Schools, the replacement of 21 modular classrooms across the district’s elementary schools with permanent classroom facilities, the addition of multi‐purpose dining commons at four elementary schools, capital repairs district‐wide, safety upgrades district‐wide, and the modernization of teaching spaces district‐wide.

Current Request(s) for Proposals – 2018 Bond